Next Chapter helped a packaging company reduce cycle times by 50%, saving them hundreds of thousands of dollars by eliminating cosmetic defects.
The Problem:
- Lack of capacity to meet customer demand
- No cooling in tall thin cores
- Cores fatigue + break early
- Long cycle time
The Goal:
- Reduce cycle time
- Eliminate core breakage
- No cosmetic defects
NXCMFG Solution:
- Conformal cooling circuit to the tip of part
- Minimize DELTA T of the cooling circuit
- Drop in replacement
- Delivery in days
The Results:
- Reduced cycle time by 50%
- No core fatigue with 420 stainless tool steel
- Eliminated cosmetic defects
- $185,000 Annual Savings